TICA Qualified Thermal Insulation Engineers (Laggers) Required
Job Description
TICA Qualified Thermal Insulation Engineers (Laggers) Required
We are currently looking to recruit experienced-TICA Qualified Thermal Insulation Engineers (TIEs/Laggers)-for a shutdown project at-Didcot Power Station. This is a great opportunity to join a busy site with-immediate starts available-and competitive NAECI rates.
The project is expected to run for-3 to 4 weeks, with plenty of hours available and additional bonuses and allowances on offer.
The Role
Successful candidates will be involved in a range of thermal insulation activities across industrial plant and pipework systems. Duties will include:
- Installation, maintenance and removal of thermal insulation on pipework, vessels, ducting and associated plant equipment.
- Measuring, cutting and fitting a variety of insulation materials to required specifications.
- Fabrication and installation of aluminium and stainless steel cladding.
- Working from drawings, specifications and site instructions to complete works safely and efficiently.
- Carrying out repairs, modifications and replacements to existing insulation systems.
- Maintaining high standards of quality, housekeeping and health & safety at all times.
- Working as part of an experienced site team to meet project deadlines.
Requirements
- Valid-TICA qualification/card.
- Previous experience working on industrial, power generation, petrochemical or similar sites.
- Strong understanding of insulation systems and metal cladding installation.
- Ability to work safely and effectively in a busy site environment.
- Immediate availability preferred.
NAECI Cat 4 Grade 5 PAYE Rates
Monday to Friday (First 38 Hours)
-20.91 per hour
Overtime 1 (After 38 Hours & First 4 Hours on Saturday)
-29.27 per hour
Overtime 2 (After 4 Hours on Saturday & All Day Sunday)
-37.64 per hour
Additional Benefits
- -1.00 per hour bonus
- Paid travel time
- Train fares covered
- Lodge allowance of -53.39 per day (taxable)
Project Details
Location:-Didcot Power Station
Duration:-3-4 Weeks
Start Date:-ASAP